Shanghai Zhanju Energy Technology Co., Ltd.
|
Gold Index: 10107
Place of Origin: | Jiangsu, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Three Phase Industrial Standby Generator Four Stoke Forced Watercooling
Control system:
1. DSE7320 Controller/Standard/ (Deepsea/DEIF/Harsen are options)
2. Operating temperature :-2060 Relative Humidity : 95%
3. Operating voltage :DC24V ( range :18-30V, pressure :50V/5 mm )
4. Used for automatic control system of diesel generator:Generation controller integrating digital, intelligent and network techniques,so that it can carry out functions including automatic start/stop, data measure and alarm
5. Automatic Mains Failure Module-- Auto& AMF;
6. Using microprocessor as a core, graphics LCD with big screen & back light;
7. Control protection:Automatic/ manual start/stop, load transfer and alarming of generator;
8. Display of generator cumulated electricity energy;
Parameter:
Type | Vertical,water cooling,four stoke |
Combustion chamber type | Direct injector |
Number of cylinders | 4 |
Bore(mm) | 100 |
Stoke(mm) | 105 |
Compression ratio | 18 |
Total displacement(L) | 3.298 |
Firing order | 1-3-4-2 |
Rated power(KW) | 25/1500 30/1800 |
Min.specific fuel consumption at full load(g/kW.h) |
≤237 |
Cooling methed | Forced watercooling |
Starting methed | Electric |
Net mass | 300 |
Overall dimensions(L*W*H) (mm) |
892×618×718 |
Description:
1. 1 control module DeepSea , Comap , Smartgen
2. support customized service and OKD .
3. fuel tank can be increased to 48 hours.
4. generator: Stamford Copy Stamford
Competitive Advantage:
1. Excellent accessibility and serviceability
2. Works reliably in extreme temperatures
3. High temperature baking Option Zinc base
4. with forklift and lifting point
5. Two large doors on either side
6. 50 Radiator
7. Low noise design
8. Option big oil tank
9. Easy maintenance
10. IP54
11. Good safety protection design
12. Worldwide Famous Brand Engine and Alternator
1. Inspection
1. All products must be tested at manufacturer’s workshop according to ISO standard
2. Ensure the delivery date of the contract
3. Qualified Certificate, Parameters and the Performance Index is according to test.
2. Warranty and Maintenance:
1. 2000 running hours whichever comes first,or 12 months from the date when the generator has been delivered from the factory.
2. Provide warranty and installation instruction manual
3. Spare-parts can also be sent by air express.
4. 24 hours service hotline is available for customers.
Shanghai Zhanju Energy Technology Co., Ltd. [China (Mainland)]
Business Type:Manufacturer
City: Suzhou
Province/State: Jiangsu
Country/Region: China (Mainland)